  GEMCO Type H & HM Installation, Dimensions
     and Service Manual:

  Type H Brake System
  Type HM Brake System
  General
  Brake Dimensions
  Air-Over-Hydraulic (Type A/H)
     Brake System
  Air-Over-Hydraulic Parking
     (Type A/HM) Brake System
  Type A/H and A/HM General
     Information
  General Troubleshooting
     INSTALLATION
  Type A/HM-ERC Panel
     J100650 - J100661,
     J103650 - J103661
  Type A/HM-HRC Panel
     J100330 - J100341,
     J103330 - J103341
  Type A/HM-ARC Panel
     J10440 - J104411,
     J104424 - J104435
 
And   Or     All Site   Selected Product
Order Details
Items 0
Total $0.00
 
 
Logon Status
Not logged on

Download
 GEMCO Type H & HM Installation, Dimensions and
 Service Manual:
   Microsoft Word® 97 format (3.6 MB)
   Adobe Acrobat® format (3.3 MB)
Get Viewer
Get Reader
INSTALLATION INSTRUCTIONS
Type A/HM-HRC Panel
 
THESE INSTRUCTIONS COVER INSTALLATION OF THE FOLLOWING PANEL ASSEMBLIES:
Power Supply
380, 460 or 575V, 50/60 Hz AC
230VDC
Service
Pressure
Cluster
Air/Hydraulic Ratio
8 x 1
5 x 1
8 x 1
5 x 1
No. of
service
pressure
clusters
1*
2**
2*
33" x 45" Panel
Assembly Only
(No Enclosure)
J100330
J100332
J100334
J100331
J100333
J100335
J100336
J100338
J100340
J100337
J100339
J100341
1*
2**
2*
Panel Assy. Mounted
lnside 36 x 48 x 18
Enclosure
J100330
J100332
J100334
J100331
J100333
J100335
J100336
J100338
J100340
J100337
J100339
J100341
* Also Includes 1 - 8 x 1 ratio parking brake release pressure cluster below service cluster.
** Also Includes 2 - 8 x 1 ratio parking brake release pressure clusters below service clusters.

A/HM-HRC PANEL PIPING DIAGRAM
Mount the panel on a rigid vertical support, low enough for the 1/2" air line from the compressor to slope down to the air reservoir. This permits moisture to drain to the reservoir where it can be automatically ejected by the moisture valve.
 
Pipe and wire the panel into the system per applicable connection diagrams.
 
After the brake system is completely piped and wired, turn power ON. Check preset air pressures:
 
  1. Compressor supply pressure at gauge A must range from 75-90 psi. This pressure is controlled by 1PS N.C. pressure switch.

  2.  
  3. Emergency pressure step (ON when ESV solenoid valve is deenergized) is factory set at 40 psi by regulator in front of gauge B.
  1. Abnormally low compressor supply pressure is signalled by 2PS N.O. pressure switch, which must close on 60 psi increasing pressure and open on 50 psi decreasing pressure.
SPECIAL BLEEDING AND PRESSURE ADJUSTMENT INSTRUCTIONS FOR A/HM-HRC SYSTEM
  1. Fill fluid reservoir/bleeder(s), pressure cluster(s) and control cylinder (and pilot circuit reservoir if used). Bleed the service brake circuit by holding BPB service brake bleeder pushbutton in and stroking the service brake pressure cluster(s) by repeatedly pushing BFP brake filling pushbutton. Bleed the parking brake circuit by holding BPB parking brake bleeder pushbutton in and stroking the parking brake pressure cluster(s) by repeatedly pushing the BCV bleed control valve. Bleed the HRC circuit (if used) by opening the bleeder screw on the HRC valve and pumping the control cylinder until clear fluid escapes from the bleeder screw. Close bleeder screw. If HRC circuit includes coiled or looped hose, move trolley to cause straightest possible hose length when bleeding system.
  1. After the brake system is bled and brakes are adjusted, operate brake system. Operation should be precise, without noticeable time delay. Check operation of emergency brake step by disconnecting power. The crane should come to a quick stop without abnormal hook swing. Adjust emergency brake pressure at gauge B if necessary. Note: twenty seconds after high pressure step application, the protection valve control pressure is reduced, causing the valve to exhaust parking brake release pressure. Parking brakes are spring applied. High pressure step is then exhausted from the service brake pressure cluster(s).
AC WIRING DIAGRAM
TYPE A/HM-HRC AIR/HYDRAULIC
PREWIRED CONTROL PANEL
DC WIRING DIAGRAM
TYPE A/HM-HRC AIR/HYDRAULIC
PREWIRED CONTROL PANEL
Note: Standard AC Panels Are Designed For 460V Operation. 1PS - N.C. Compressor Start-Stop Pressure Switch (80/65 PSI)
2PS - N.O. System Pressure Switch (60/50 PSI)
BPB - Bleeder Pushbutton
BFP - Service Brake Filling Pushbutton